Berryville prepared to raise fees for plant upgrades

Winchester Star – Town residents could see an increase in sewer-user fees several years from now when the construction of the wastewater treatment plant is completed. The cost of the plant upgrade, including the construction of an approximately 4-mile pipe to carry treated wastewater to the Shenandoah River, is about $25 million, Town Manager Keith Dalton said.

Short URL: http://www.news.synavista.com/?p=1017

Posted by on Jan 4 2009. Filed under Winchester News. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

Comments are closed

Search Archive

Search by Date
Search by Category
Search with Google
Log in | Designed by Gabfire themes